Accessible locations on both sides of the gym were added to the existing bleachers in May, 2024. Bleacher inspection and other routine maintenance and minor updates were performed as well.
|
|
Elementary Boiler Update-2024 |
|
The 40+ year old elementary school heat exchangers were on their last life and were updated with increased energy efficiency boilers. Federal dollars were used for this facility update.
|
|
Office Flooring-2023 |
|
 |
Carpet removed, floor leveler used |
|
|
 |
Carpet removed, floor leveler used |
|
|
 |
Carpet removed, floor leveler used |
|
|
|
|
In 2023, due to a combination of several minor leaks and two roofs that had come to the end of their expected lives, the roofs at the elementary and middle/high building were repaired and replaced.
|
|
In 2022, the school district applied for and received a NSLP Equipment Assistance Grant. With the grant money, a new dishwasher and steamer were purchased, replacing existing equipment that was nearly 40 years old.
|
|
Flooring Project-2022 |
|
 |
Distance Learning Classroom Floor |
|
|
|
|
In June of 2022, due to major areas of peeling paint, the outbuildings at the ms/high school and elementary school were repainted.
|
|
In June of 2022, some problem areas of the pavement surrounding the north and east side of the ms/hs building were improved.
|
|
Updates-2019 |
|
 |
LED LIGHTING PROJECT Jackson Serum, Volunteer and Master Electrician. |
|
|
 |
LED LIGHTING PROJECT Jamey Davis, our maintenance employee volunteered his time on the evenings and weekends as well! |
|
|
 |
LED LIGHTING PROJECT Joe Serum, Volunteer |
|
|
 |
LED LIGHTING PROJECT Nick Urness, Volunteer |
|
|
 |
LED LIGHTING PROJECT Middle school classroom. The finished product provides great light for learning as well as cost savings to the district. |
|
|
 |
LED LIGHTING PROJECT High school library: BEFORE |
|
|
 |
LED LIGHTING PROJECT High school library: AFTER |
|
|
 |
LED LIGHTING PROJECT High School English room: AFTER |
|
|
 |
LED LIGHTING PROJECT Our volunteers enjoying a lunch break! |
|
|
 |
LED LIGHTING PROJECT A rebate of $4,412.90 was received from Riverland Energy Cooperative for the updated lighting project. |
|
|
 |
BOILER UPDATE This crane, towering high above the 1920 building, carefully lowered the boiler into the school basement, setting it into the room that will be its new home for many years to come. |
|
|
 |
BOILER UPDATE The boiler was carefully maneuvered into the basement through the old coal chute, which hasn't been used for many, many years. |
|
|
 |
NETWORK INFRASTRUCTURE Many feet of new network cables were thread through the district's buildings to upgrade and enable the network to handle today's technology needs. |
|
|
 |
NETWORK INFRASTRUCTURE An old janitor's closet on the 2nd floor of the MS/HS building was converted into the new network closet to house the servers and switches, as well as the HVAC computer controls and the Ntec telephone system computer controls. |
|
|
 |
NETWORK INFRASTRUCTURE The network upgrade at the elementary building. |
|
|
Several community members volunteered their time for this update. This isn't the first time volunteers have helped make updates at the school. It's a long-standing tradition that started in 1948 when the gym was added on to the school! Updates were made to lighting, boiler and the computer network infrastructure.
|
|
|
|